Discover the 2026 CHEVROLET COLORADO ZR2 CREW 4WD, a rugged and high-performance truck designed for thrill-seekers.
Powered by a 2.7L TURBOMAX engine and an 8-speed automatic transmission, this vehicle offers exceptional power with its four-wheel drive. The ZR2 edition stands out with its factory-installed 3-inch lift system and high-performance suspension, perfect for challenging terrains.
Inside, enjoy the comfort of perforated leather seats that are heated and ventilated, along with a heated steering wheel. The power sunroof adds a touch of luxury, while the onboard technology includes wireless phone projection for Apple CarPlay and Android Auto, as well as an 11-inch digital dashboard computer.
Safety is paramount with advanced features such as automatic emergency braking, collision prevention alert, and lane-keeping assist. For music lovers, a trial subscription to SiriusXM radio is included, allowing you to enjoy your favorite tunes on the road.
This truck is ready to conquer all terrains with its all-terrain tires and 2-speed electronic Autotrac transfer case.
Come discover this exceptional vehicle at Lussier Chevrolet in Saint-Hyacinthe. Contact us at (450) 778-1112 for more information.
Options
Air conditioning, dual-zone automatic climate control
Air vents, rear
Airbags, Dual-stage frontal airbags for driver and front passenger; Seat-mounted side-impact airbags for driver and front outboard passenger; Head-curtain airbags for front and rear outboard seating positions; Includes front outboard Passenger Sensing System for frontal passenger airbag
Alternator, 220 amp
Armrest, rear centre
Audio system feature, 6-speaker system,
Automatic Stop/Start
BARRE LUMINEUSE TOUT TERRAIN MONTEE SUR LE TOIT (INSTALLE PAR LE CONCESS.)
BARRE SPORT MONTE SUR LA CAISSE (INSTALLE PAR LE CONCESS.)
BLOC DE DISTRIBUTION ELECTR. (INSTALLE PAR LE CONCESS.)
Buckle to Drive prevents vehicle from being shifted out of Park until driver seat belt is fastened; times out after 20 seconds and encourages seat belt use, can be turned on and off in Settings menu
Capless fuel fill
Cargo box light, back of cab
Console, floor front compartment with cup holders and cell phone storage
Cruise control, electronic, automatic
DOUBLURE DE CAISSE VAPORISEE
Daytime Running Lamps, LED
Defogger, rear-window electric
Differential, electronic, driver-selectable full-locking front
Door handles, body-colour ((ULV) ZR2 Bison Edition will include gloss black painted door handles.)
Door locks, power
Door locks, rear child security
Driver Information centre, 11" diagonal fully-digital display
Driver Memory Settings, recalls driver "presets" for power driver seat and outside mirrors
EDITION MINUIT
EMBLEME DE CAPOT TURBOMAX (INSTALLE PAR LE CONCESS.)
EQUIPEMENT DE SERIE/CANADA
Engine air filtration monitor
Engine control, stop/start system disable button
Exterior, B-pillar applique (Not available with (GBA) Black exterior.)
FRAIS MAXIMUM DU CONCESS.
Floor covering, colour-keyed carpeting
Floor mats, carpeted front
Floor mats, carpeted rear
Fog lamps, front LED
Following Distance Indicator
Forward Collision Alert
Four Wheel Drive
Frame, fully-boxed
Front Pedestrian and Bicyclist Braking
Front outboard Passenger Sensing System for frontal outboard passenger airbag
GROUPE D'EQUIP. PRIVILEGIES
GVWR, 6250 lbs. (2835 kg) (Not available with (ULV) ZR2 Bison Edition.)
Glass, deep-tinted
Glass, privacy glazing rear side windows
Glass, solar glazing front side windows
HD Rear Vision Camera (Not available with (CWM) Technology Package.)
Handles, door release, front and rear, Chrome
Headlamp control, automatic on and off with automatic delay
Headlamps, LED
Heater, air conditioning duct, rear passenger
Hill Descent Control
Hitch Guidance dynamic single line to aid in truck trailer alignment for hitching
Hitch View
IntelliBeam, automatic high beam on/off
Keyless Open and Start
LED Reflective Windshield Collision Alert
LED Tail lamp, Stop
LPO, TurboMax hood emblem
Lane Keep Assist with Lane Departure Warning
Lighting, interior, centre dome
Lighting, interior, dual reading
Locking cylinder Tailgate, keyed cylinder lock
MONOGRAMMES NOIRS (INSTALLE PAR LE CONCESS.)
MOTEUR TURBOMAX DE 2,7 L
Map pocket, driver seatback
Map pocket, front passenger seatback
Mirror caps, painted (Painted Black.)
Mirror, inside rearview auto-dimming
Mirrors, outside heated power-adjustable
Mouldings, Black beltline
OnStar Basics (OnStar Fleet Basics for Fleet) Drive more confidently with up to 8 years of core OnStar services including mobile app commands, connectivity for select apps that provide in-vehicle voice assistance and navigation with real-time traffic, and Automatic Crash Response. (Requires (UE1) OnStar. Term begins on vehicle delivery date. Paid subscription required after expiry. Services are dependent on compatible wireless networks provided by third-party wireless service providers, working vehicle electrical systems, GPS signal and other factors outside GM control. Changes in technology and wireless networks may limit or prevent the operation of certain services. Services, connectivity, and capabilities have additional terms and limitations and are subject to change, and will vary by model, vehicle configuration, software version, conditions, and geographical and technical restrictions. Compatible smartphone required for mobile app commands. Not all vehicles may transmit all crash data; OnStar links to emergency services; Voice and Maps apps are subject to change at any time and may be provided by third parties. Non-refundable and no cash value. See onstar.ca/en/info for terms and details.)
OnStar services capable (See onstar.ca for details and limitations. Services vary by model. Service plan required.)
PNBV: 2 835 KG (6 250 LB)
PONT ARRIERE - RAPPORT DE 3.42
PROTECTION DE PANNEAUX DE BAS DE CAISSE
Pickup box
Power outlet, 12-volt located in centre console bin
Power outlet, 120-volt, bed-mounted
Power outlet, 120-volt, located in the rear of centre console
Push Button Start
Radiator Grille Shutters, automatic
Rear Cross Traffic Braking
Rear Park Assist
Rear Seat Belt Indicator
Rear Seat Reminder
Rear axle, 3.42 ratio
Red Recovery Hooks, front
Remote vehicle starter system
Rocker Panel Protector
SABLES BLANCS
Seat Belt, Black
Seat adjuster, driver 8-way power
Seat adjuster, passenger 4-way manual
Seat adjuster, power driver lumbar control
Seat trim, Perforated leather-appointed
Seat, rear 60/40 split-folding bench with storage
Seats, heated driver and front passenger
Seats, ventilated driver and front passenger
SiriusXM with 360L Trial Subscription. SiriusXM with 360L transforms your customers' ride with our most extensive and personalized radio experience on the road. (IMPORTANT: The SiriusXM trial subscription is not provided on vehicles that are ordered for Fleet Daily Rental ("FDR") use. Certain features and/or content may not be available unless an active data connection is enabled in the vehicle. Content varies by SiriusXM subscription plan. Features and display may vary by vehicle. All SIiriusXM services require a subscription, sold separately by SiriusXM after the trial period. Your SiriusXM service will automatically stop at the end of your trial unless you decide to subscribe. If you decide to continue service after your trial, the subscription plan you choose will continue for an indeterminate term and you will be charged according to your chosen payment method at the then current rates unless and until you cancel. Taxes apply. Please see the SiriusXM Customer Agreement at siriusxm.ca/terms for complete terms and how to cancel, which includes calling SiriusXM at 1-888-539-7474. All rates, content, and programming are subject to change. SiriusXM uses personal information in accordance with SiriusXM Privacy Policy, available at siriusxm.ca/privacy. SiriusXM Canada Inc. "SiriusXM", the SiriusXM logo, channel names and logos are trademarks of Sirius XM Radio Inc. and are used under license.)
Speedometer, miles/kilometres
StabiliTrak, stability control system with Proactive Roll Avoidance and traction control includes electronic trailer sway control and hill start assist
Steering column, tilt and telescoping
Steering wheel controls, mounted audio controls
Steering wheel, heated
Steering wheel, wrapped
StowFlex Tailgate, storage compartment, lockable
Switch, Flexride mode system
TOIT OUVRANT, COMM. ELECTRIQUE
Tailgate, EZ-Lift and Lower
Tailgate, remote locking, (locks and unlocks with key fob)
Teen Driver a configurable feature that lets you activate customizable vehicle settings associated with a key fob, to help encourage safe driving behaviour.
Theft-deterrent system, unauthorized entry
Tire Fill Alert provides an audible indication when tire pressure is added to a tire that is low. Aids to achieve optimal tire pressure
Tire Pressure Monitoring System (does not apply to spare tire)
Tire, spare LT285/70R17, blackwall
Tires, LT285/70R17, blackwall, 33" OD MT (Requires (R1U) 17" aluminum wheels, (RIG) 17" High Gloss Black wheels, (SRH) 17" Aluminum wheels, LPO or (SMY) 17" Beadlock Capable Wheel, LPO.)
Trailer brake controller, integrated
Trailering App
Trailering Package, heavy-duty includes trailer hitch and 7-pin connector
Transfer case, two-speed, electronic Autotrac with push button control includes transfer case shield
Transmission, 8-speed automatic
USB Ports, 2 (first row) located on console
USB Ports, rear, dual, charge-only
Vehicle health management, provides advanced warning of vehicle issues
Visors, driver and front passenger illuminated sliding vanity mirrors
Wheel flares
Wheel, spare, 17 x 8" (43.2 cm x 20.3 cm) steel
Wi-Fi Hotspot capable (Terms and limitations apply. See onstar.ca or dealer for details.)
Window, power front, passenger express down
Window, rear-sliding, manual
Windows, power rear, express down
Windows, power with driver express up/down
Windows, remote express down all windows
Windshield, solar absorbing
Wireless Phone Charging (Not compatible with all phones or devices. Compliant devices include Qi technologies. Reference your mobile device manual to confirm what type of wireless power it uses.)
Wireless phone projection, for Apple CarPlay and Android Auto
ZR2 Off-Road Package includes 3-inch factory-installed lift with high-performance suspension and wider chassis, Multimatic DSSV dampers, off-road front fascia and rear bumper, fender flares and flow tie
Total vehicle price: $ (+ taxes). Lease of km per year. Total credit charges: $ . Transport and preparation included in the payment. Sales taxes not included.
Options and accessories may vary depending on version. MSRP price excludes some extra options or taxes such as air conditioning tax. This data, including the price, may contain some errors. Please contact us for all the details. The price displayed may exclude current promotions.
You have to contact us to have an offer for the information provided.
Total vehicle price: $ (+ taxes). Total obligation: $ . Total credit charges: $ . Transport and preparation included in the payment. Sales taxes not included.
Options and accessories may vary depending on version. MSRP price excludes any required options or taxes such as air conditioner tax. This data, including the price, may contain some errors. Please contact us for all the details. The price provided may exclude any current promotions.
Government electric rebate of $ (Provincial) and $ (Federal) are applicable before taxes and are included in the displayed payment.
You have to contact us to have an offer for the information provided.
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional
Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes.The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.